Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 9021

Re: when i am costing a material system is pickig the old cost estiamte

$
0
0

If you only calculate std cost for raw material with do not cost flag, System don’t calculate std cost.

If you calculate std cost  for FG or SFG which have raw material with do not cost flag as bom item, System calculate STD cost including the raw material’s cost.

To avoid it, raw material with do not cost flag as bom item have space for Relevancy to Costing .


Viewing all articles
Browse latest Browse all 9021

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>