Dear Experts,
We have assigned one Raw Material 1 in HALB Material BOM for which there is no moving average price in material master since its PO is in process.
Second thing, this material is used as alternative to another Raw Material 2.Raw Material 1 has usage probability 0 while Raw Material 2 has usage probability 100.Both of these materials have been transferred to Production Order with Raw Material 1,Quantity 0 & Raw Material 2 with quantity 200.
During Costing system considers both of materials and gives CSER Error which create hindrance in confirmation.
I want system behaviour not to consider Raw Material 1 during costing who material master has zero MAP & it is being used as alternative with usage probability zero.
Regards,
waqas