Hello Mr. . raghavendra sai and Mr. Kiran Kumar thank you for your help. I´ve been checking the both suggestions and the one that most approach was MM50 transaction, but the same gives me just the option of change the MRP I from the material.
For example: I have an Excel spreadsheet where there is a lot of materials with MRP I policies and the same has been already updated on SAP, using the transaction MM02, but I need some report that shows which were this changes made on MRP I and also to know if there is no left material without doing the update.
Regards
Sílvio.